Singapore - Feedback (Q1 2010)

Moderators: Chuah, Moderators, Regional Mappers

User avatar
johnTan
Valued Contributor
Posts: 417
Joined: Tue Oct 28, 2008 5:36 pm
Location: PRK, JB, SG

Re: Singapore - Feedback (Q1 2010)

Postby johnTan » Thu Mar 25, 2010 9:23 am

Wyeth Pfizer merger, now the building name already replace from Wyeth to Pfizer.
NH techno glass, Now already rename as AvanStrate Asia, the business still the same, Making LCD-TFT Glass.

Road block from N1 18.583 E103 38.147 to N1 18.007 E103 38.039,
due to a New road is making in progress,
A new road will link Pfizer(former Wyeth) to Lonza.
Road block estimate will open again on 14th May 2010.

Done! 171 - OngCC
You do not have the required permissions to view the files attached to this post.

linuxdude
Posts: 6
Joined: Thu Oct 15, 2009 9:50 pm
Location: garmin nuvi 255w

Re: Singapore - Feedback (Q1 2010)

Postby linuxdude » Thu Mar 25, 2010 5:55 pm

A few routing errors i noticed, places where you cant u-turn they ask u to u-turn, places you can u-turn they ask u go further up, anywayz its all in the mapsource file. Thanks!

Done! 171 - OngCC
You do not have the required permissions to view the files attached to this post.
DropBox - Online Storage & Sync -> https://www.dropbox.com/referrals/NTg5NjE0Nzk

shinkansen
Posts: 14
Joined: Tue Jan 26, 2010 5:56 pm
Location: Singapore

Re: Singapore - Feedback (Q1 2010)

Postby shinkansen » Sat Mar 27, 2010 2:13 pm

The polygon representing Block 326 Serangoon Avenue 3 should not be joined to that of Block 329.

There is a gap between the two blocks, which is currently where the 7-Eleven and OCBC ATM text is placed.

The POI for the 7-Eleven should also be located in the middle of Block 326.

Done! 171 - OngCC
You do not have the required permissions to view the files attached to this post.

User avatar
Redstorm
Contributor
Posts: 211
Joined: Tue Sep 16, 2008 4:30 pm
Location: Singapore

Re: Singapore - Feedback (Q1 2010)

Postby Redstorm » Mon Mar 29, 2010 12:22 pm

V 100329

There is no break in between the polygons for the building housing the Upper Serangoon Shopping Centre and the building housing Fragrance Hotel Kovan and Hotel 81 Kovan. New POIs included are Canadian 241 Pizza and not one but two 7-Eleven outlets (7-Eleven Hotel 81 and 7-Eleven Fragrance Hotel Kovan). Please re-aligned the POIs according to what I indicate here.
You do not have the required permissions to view the files attached to this post.
Free beer tomorrow!ImageImage

SaenchaiKingstar
Posts: 45
Joined: Fri May 22, 2009 3:25 pm
Location: Zumo550

Re: Singapore - Feedback (Q1 2010)

Postby SaenchaiKingstar » Mon Mar 29, 2010 4:35 pm

v100329

When travelling from Raffles Boulevard to Mandarin Hotel, current map routes you to go one big round. You can actually cut across Temasek Ave which is much shorter.

Pls see Routes in attached file, it routes you to go one big round.
You do not have the required permissions to view the files attached to this post.

SaenchaiKingstar
Posts: 45
Joined: Fri May 22, 2009 3:25 pm
Location: Zumo550

Re: Singapore - Feedback (Q1 2010)

Postby SaenchaiKingstar » Mon Mar 29, 2010 4:46 pm

v100329

There is a sliproad that connects from the small roads inside The Plaza to Nicoll Highway, this road is missing on the map.
You do not have the required permissions to view the files attached to this post.

User avatar
Redstorm
Contributor
Posts: 211
Joined: Tue Sep 16, 2008 4:30 pm
Location: Singapore

Re: Singapore - Feedback (Q1 2010)

Postby Redstorm » Tue Mar 30, 2010 5:37 pm

v 100329

The vacant buildings, inside the red square, situated between Hougang Ave 3 and Defu Avenue 1, are no longer there as they had already been demolished.
You do not have the required permissions to view the files attached to this post.
Free beer tomorrow!ImageImage

User avatar
255w
Contributor
Posts: 217
Joined: Sat Nov 28, 2009 8:42 am
Location: Malaysia–Singapore

Re: Singapore - Feedback (Q1 2010)

Postby 255w » Tue Mar 30, 2010 8:39 pm

It's illegal to U-Turn and turn into Thomson Plaza as attached along Upper Thomson Road.
You do not have the required permissions to view the files attached to this post.

User avatar
Redstorm
Contributor
Posts: 211
Joined: Tue Sep 16, 2008 4:30 pm
Location: Singapore

Re: Singapore - Feedback (Q1 2010)

Postby Redstorm » Tue Mar 30, 2010 9:28 pm

V 100329

Recently, travelled along Choa Chu Kang Drive and was prompted to make an U-turn at the junction of Choa Chu Kang Crescent. U-turn at this junction is illegal.
You do not have the required permissions to view the files attached to this post.
Free beer tomorrow!ImageImage

User avatar
255w
Contributor
Posts: 217
Joined: Sat Nov 28, 2009 8:42 am
Location: Malaysia–Singapore

Re: Singapore - Feedback (Q1 2010)

Postby 255w » Wed Mar 31, 2010 10:19 pm

Bro OngCC, I've encountered another strange routing problem...
Why is it that both starting point on S.L.E but giving different route to Woodlands Civic Centre :-?

Exit 9 S.L.E. to Woodlands Civic Centre -> Via Ave 7

S.L.E. to Woodlands Civic Centre -> Via Ave 5
The preferred route should be via Via Ave 5 as it is much shorter, please help to rectify this problem. :tq:

Not sure what is causing this... - OngCC
You do not have the required permissions to view the files attached to this post.


Return to “SG Archives”

Who is online

Users browsing this forum: No registered users and 8 guests