Singapore - Feedback (Q1 2010)

Moderators: Chuah, Moderators, Regional Mappers

epi
Valued Contributor
Posts: 3291
Joined: Wed Mar 18, 2009 12:13 pm
Location: Singapore

Re: Singapore - Feedback (Q1 2010)

Postby epi » Wed Nov 03, 2010 2:14 pm

V.101101,
The Whampoa Drive is a 1-line 2-way flow road started at the beginning point at "START" till the ending point at "END".
In the example of the simulation routing by the Mapsource as shown it is being made to be 1-line 1-way flow road.
It is proven that it has been converted to be 1-line 1-way only by routing a big round from pt. A to Destination instead of directly from pt. A to Destination shortly.
Please rectify if possible.
Thanks.

Done! 203 - OngCC
You do not have the required permissions to view the files attached to this post.

gvmsia
Posts: 69
Joined: Fri Sep 19, 2008 2:49 pm

Re: Singapore - Feedback (Q1 2010)

Postby gvmsia » Fri Nov 05, 2010 12:43 pm

while traveling along PIE, there was no prompt to keep right
Image
Image
Image

Done! 203 - OngCC
You do not have the required permissions to view the files attached to this post.

epi
Valued Contributor
Posts: 3291
Joined: Wed Mar 18, 2009 12:13 pm
Location: Singapore

Re: Singapore - Feedback (Q1 2010)

Postby epi » Mon Nov 08, 2010 12:53 am

epi wrote:V.101018,
The tracking line is not working using Mapsource simulation.
Thanks.

The problem is still not rectified yet on the latest V.101108 using Mapsource simulation.
See file i.e. Spc Yio Chu Kang.
Thanks.
You do not have the required permissions to view the files attached to this post.

epi
Valued Contributor
Posts: 3291
Joined: Wed Mar 18, 2009 12:13 pm
Location: Singapore

Re: Singapore - Feedback (Q1 2010)

Postby epi » Mon Nov 08, 2010 4:58 pm

V.101108,
Haugang Ave 1 is a 2-line flow road started at "Traffic Light Junction 1".
Thanks.
Last edited by epi on Mon Nov 08, 2010 7:13 pm, edited 1 time in total.

epi
Valued Contributor
Posts: 3291
Joined: Wed Mar 18, 2009 12:13 pm
Location: Singapore

Re: Singapore - Feedback (Q1 2010)

Postby epi » Mon Nov 08, 2010 7:12 pm

epi wrote:V.101108,
Haugang Ave 1 is a 2-line flow road started at "Traffic Light Junction 1".
Thanks.

Bro Ong,
Please refer to the "N Haugang Ave 1" for amendment reference. Some careless mistake comments made on "Haugang Ave 1". Do not use 'Haugang Ave 1".
Thanks.
You do not have the required permissions to view the files attached to this post.
Last edited by epi on Mon Nov 08, 2010 10:01 pm, edited 1 time in total.

epi
Valued Contributor
Posts: 3291
Joined: Wed Mar 18, 2009 12:13 pm
Location: Singapore

Re: Singapore - Feedback (Q1 2010)

Postby epi » Mon Nov 08, 2010 8:17 pm

V.101108,
Hougang Ave 7 is a 2-line flow road.
At one end of Hougang Ave 7 at Tampines Rd where there is a alley started at pt. A joined with the main road at pt.D. This alley path A B D is a mistake alley pathway.
The correct pathway should be A B C . It joined the pathway between the pt. B and pt.C which formed a complete pathway loop to HDB.
The alley marked B D therefore should be deleted. It is non existent.
Thanks.
You do not have the required permissions to view the files attached to this post.

epi
Valued Contributor
Posts: 3291
Joined: Wed Mar 18, 2009 12:13 pm
Location: Singapore

Re: Singapore - Feedback (Q1 2010)

Postby epi » Mon Nov 08, 2010 8:48 pm

V.101108,
Hougang Central is a 2-line road.
Thanks.
You do not have the required permissions to view the files attached to this post.

epi
Valued Contributor
Posts: 3291
Joined: Wed Mar 18, 2009 12:13 pm
Location: Singapore

Re: Singapore - Feedback (Q1 2010)

Postby epi » Mon Nov 08, 2010 9:25 pm

V.101108,
Hougang Ave 4 is a 2-line flow road.
Thanks.
You do not have the required permissions to view the files attached to this post.

epi
Valued Contributor
Posts: 3291
Joined: Wed Mar 18, 2009 12:13 pm
Location: Singapore

Re: Singapore - Feedback (Q1 2010)

Postby epi » Mon Nov 08, 2010 10:03 pm

V.101108,
Haugang Ave 9 is a 2-line flow road.
Thanks.

Done! 204 - OngCC
You do not have the required permissions to view the files attached to this post.

vios484
Posts: 9
Joined: Sun Jan 04, 2009 5:18 am

Re: Singapore - Feedback (Q1 2010)

Postby vios484 » Thu Nov 11, 2010 4:43 pm

POI Error : There are no more Caltex Station along Pasir Panjang Road. Loaded in latest mfm map and was guided to this destination for re-fuel and realise that the POI is no more.

Deleted [N1 16.555 E103 47.621], is this correct? Chuah


Return to “SG Archives”

Who is online

Users browsing this forum: No registered users and 16 guests