Senai-Desaru Expressway
Moderators: Moderators, Regional Mappers
Forum rules
1. Be nice to each other and respect the moderators. Post in normal font size, color and weight. Follow Nettiquette
2. NO out of topic. Discuss matters pertaining MFM community and forum only.
3. NO abuse, profanity and insults
4. NO spamming, cross posting and opening of duplicate topics
5. NO advertisement post or link
6. NO post/link to warez, cracks, serials or illegally obtained copyrighted content
7. Each message posted is owned by and is the opinion of the original poster. Neither mfm nor its owner or moderators are legally responsible for anything posted on the forum
1. Be nice to each other and respect the moderators. Post in normal font size, color and weight. Follow Nettiquette
2. NO out of topic. Discuss matters pertaining MFM community and forum only.
3. NO abuse, profanity and insults
4. NO spamming, cross posting and opening of duplicate topics
5. NO advertisement post or link
6. NO post/link to warez, cracks, serials or illegally obtained copyrighted content
7. Each message posted is owned by and is the opinion of the original poster. Neither mfm nor its owner or moderators are legally responsible for anything posted on the forum
- silverbeauty
- Moderator
- Posts: 3526
- Joined: Tue Sep 16, 2008 6:29 pm
- Location: Sin-Ka-Pu-Ra Garmin Nüvi1350, 3790T, Fenix, eTrex HcX Panasonic ICE+Garmin Samsung Note3 Apple iPad3
Senai-Desaru Expressway
Anyone can verify / confirm that the entire stretch has been completed and operational ?
Re: Senai-Desaru Expressway
Hi,
I traveled to Kong Kong last week using the Senai Desaru expressway. The highway ends at Cahaya Baru. The shops at the rest stop are not open.
I inquired and got a reply on 19 April 2011:
Dear Mike,
Thank you for your question. For your information sir, we are still waiting
for the approval of Package-3 opening (Cahaya Baru - Desaru) from Malaysian
Highway Authority. Until then, we can't give the exact date when Package-3
is usable to the public. Thank you.
E22TMC
I traveled to Kong Kong last week using the Senai Desaru expressway. The highway ends at Cahaya Baru. The shops at the rest stop are not open.
I inquired and got a reply on 19 April 2011:
Dear Mike,
Thank you for your question. For your information sir, we are still waiting
for the approval of Package-3 opening (Cahaya Baru - Desaru) from Malaysian
Highway Authority. Until then, we can't give the exact date when Package-3
is usable to the public. Thank you.
E22TMC
- fruitplus
- Polygon Mapper
- Posts: 1425
- Joined: Sat Jan 24, 2009 3:35 pm
- Location: On The Road
- Contact:
Re: Senai-Desaru Expressway
silverbeauty wrote:Anyone can verify / confirm that the entire stretch has been completed and operational ?
They still building the "Penang Bridge" across the Johor River as post by Gegala in his Facebook early this year..
Past + Present = Future
- silverbeauty
- Moderator
- Posts: 3526
- Joined: Tue Sep 16, 2008 6:29 pm
- Location: Sin-Ka-Pu-Ra Garmin Nüvi1350, 3790T, Fenix, eTrex HcX Panasonic ICE+Garmin Samsung Note3 Apple iPad3
Re: Senai-Desaru Expressway
for the feedback.
Re: Senai-Desaru Expressway
The highway operator are waiting for the authority's approval to open up the section of the highway from Cahaya Baru to Penawar intersection. Of course, subject to highway operator's fulfillment of the authority's "must-meet" requirement. Constructions are already completed.
Senai - Desaru Expressway ready already?
http://www.e22.com.my/Latest/E22-Expressway-Opening-Soon.html
The opening of the E22 will be separated into two (2) phases. Phase 1 already opened effective from 10th September 2009. The length of Phase 1 of the E22 is approximately 50km, stretching from Senai to Cahaya Baru with a connection to Pasir Gudang. The E22 Phase 1 opening includes five (5) interchanges; (Utama Senai Interchange, Bandar Senai Interchange, Ulu Tiram Interchange, Cahaya Baru Interchange and Pasir Gudang Interchange) and two (2) Rest & Service Areas.
The E22 Phase has been completed and pending government approval to open the expressway to the public. The Phase 2 is approximately 27km in length stretching from Cahaya Baru to Desaru, it includes the Single Plane Cable-Stayed Bridge across Sg Johor and ends at the Penawar Interchange.
The opening of the E22 will be separated into two (2) phases. Phase 1 already opened effective from 10th September 2009. The length of Phase 1 of the E22 is approximately 50km, stretching from Senai to Cahaya Baru with a connection to Pasir Gudang. The E22 Phase 1 opening includes five (5) interchanges; (Utama Senai Interchange, Bandar Senai Interchange, Ulu Tiram Interchange, Cahaya Baru Interchange and Pasir Gudang Interchange) and two (2) Rest & Service Areas.
The E22 Phase has been completed and pending government approval to open the expressway to the public. The Phase 2 is approximately 27km in length stretching from Cahaya Baru to Desaru, it includes the Single Plane Cable-Stayed Bridge across Sg Johor and ends at the Penawar Interchange.
User of 205 / 205W
Currently using 255W and 205W, 4592 LM
Currently using 255W and 205W, 4592 LM
Re: Senai - Desaru Expressway ready already?
i wish they are ready by now since i want to go to pengerang this week...
User of Nuvi 260w
Re: Senai - Desaru Expressway ready already?
disc2la wrote:i wish they are ready by now since i want to go to pengerang this week...
waiting for your feedback.
i hope its in operation asap
User of 205 / 205W
Currently using 255W and 205W, 4592 LM
Currently using 255W and 205W, 4592 LM
Re: Senai-Desaru Expressway
It should open this Friday (tomorrow) and free usage for a month. I heard from news at Sinar.fm last 2,3 days if not mistaken
Re: Senai-Desaru Expressway
Hi,
I just received an email informing that the E22 is fully opened on 10 June 2011.
I just received an email informing that the E22 is fully opened on 10 June 2011.