Tracks for Seduku resettlement scheme
Done 31/5/2011 -- tympg
Sri Aman/Betong Tracks & POIs
Moderators: Moderators, Regional Mappers
Forum rules
1. Be nice to each other and respect the moderators. Post in normal font size, color and weight. Follow Nettiquette
2. NO out of topic. This forum is strictly for feedback to our maps
3. NO posting of data copied from other source especially malsingmaps
4. NO abuse, profanity and insults
5. NO spamming, cross posting and opening of duplicate topics
6. NO post/link to warez, cracks, serials or illegally obtained copyrighted content
7. Each message posted is owned by and is the opinion of the original poster. Neither mfm nor its owner or moderators are legally responsible for anything posted on the forum
1. Be nice to each other and respect the moderators. Post in normal font size, color and weight. Follow Nettiquette
2. NO out of topic. This forum is strictly for feedback to our maps
3. NO posting of data copied from other source especially malsingmaps
4. NO abuse, profanity and insults
5. NO spamming, cross posting and opening of duplicate topics
6. NO post/link to warez, cracks, serials or illegally obtained copyrighted content
7. Each message posted is owned by and is the opinion of the original poster. Neither mfm nor its owner or moderators are legally responsible for anything posted on the forum
-
- Valued Contributor
- Posts: 437
- Joined: Mon Feb 14, 2011 9:52 am
- Location: Kuching, Sri Aman, Limbang, Lawas
Re: Sri Aman Division (Tracks/POIs)
You do not have the required permissions to view the files attached to this post.
-
- Valued Contributor
- Posts: 437
- Joined: Mon Feb 14, 2011 9:52 am
- Location: Kuching, Sri Aman, Limbang, Lawas
Re: Sri Aman Division (Tracks/POIs)
Track for Entulang Entawa & Entulang Kasai. Blue tracks are unpaved road.
Done 18/6/2011 -- tympg
Done 18/6/2011 -- tympg
You do not have the required permissions to view the files attached to this post.
-
- Valued Contributor
- Posts: 437
- Joined: Mon Feb 14, 2011 9:52 am
- Location: Kuching, Sri Aman, Limbang, Lawas
Re: Sri Aman Division (Tracks/POIs)
Tracks & POIs update for Rapak.
Pls rename Dewan Usik to Dewan USK at N1 05.807 E111 14.378
USK is abbrev for Urusetia Saudara Kita
Done 7/2011 -- tympg
Pls rename Dewan Usik to Dewan USK at N1 05.807 E111 14.378
USK is abbrev for Urusetia Saudara Kita
Done 7/2011 -- tympg
You do not have the required permissions to view the files attached to this post.
-
- Valued Contributor
- Posts: 437
- Joined: Mon Feb 14, 2011 9:52 am
- Location: Kuching, Sri Aman, Limbang, Lawas
Re: Sri Aman Division (Tracks/POIs)
Tracks update for Engkilili, Stuga & Sedarat Mawang.
Blue track is unpaved road.
Done 8/7/2011 -- tympg
Blue track is unpaved road.
Done 8/7/2011 -- tympg
You do not have the required permissions to view the files attached to this post.
-
- Valued Contributor
- Posts: 437
- Joined: Mon Feb 14, 2011 9:52 am
- Location: Kuching, Sri Aman, Limbang, Lawas
Re: Sri Aman Division (Tracks/POIs)
POIs & tracks update for Lubok Antu. AGRO Bank first commercial bank is opening soon in Lubok Antu.
Done 8/7/2011 -- tympg
Done 8/7/2011 -- tympg
You do not have the required permissions to view the files attached to this post.
-
- Valued Contributor
- Posts: 437
- Joined: Mon Feb 14, 2011 9:52 am
- Location: Kuching, Sri Aman, Limbang, Lawas
Re: Sri Aman Division (Tracks/POIs)
Track for Sg Ara, Lubok Antu
Done 8/7/2011 -- tympg
Done 8/7/2011 -- tympg
You do not have the required permissions to view the files attached to this post.
-
- Valued Contributor
- Posts: 437
- Joined: Mon Feb 14, 2011 9:52 am
- Location: Kuching, Sri Aman, Limbang, Lawas
Re: Sri Aman Division (Tracks/POIs)
Unpaved track linking Engkilili & Lubok Antu tracked.
Done 9/7/2011 -- tympg
Done 9/7/2011 -- tympg
You do not have the required permissions to view the files attached to this post.
Re: Sri Aman Division (Tracks/POIs)

well done bro. Finally we know, there is a road connecting. When are they going to be paved? any idea?
Nuvi200, 255W, GMXT on N5800, 60csx, Papago X3 (EastGear), Galactio V8
-
- Valued Contributor
- Posts: 437
- Joined: Mon Feb 14, 2011 9:52 am
- Location: Kuching, Sri Aman, Limbang, Lawas
Re: Sri Aman Division (Tracks/POIs)
shideen wrote::thumbsup:
well done bro. Finally we know, there is a road connecting. When are they going to be paved? any idea?
Not likely in the next few years. However, replacement of the 3 bridges along the road to permanent concrete bridges will started soon. District office is also putting up program to upgrade the road (kampung road sub-standard level).
-
- Valued Contributor
- Posts: 437
- Joined: Mon Feb 14, 2011 9:52 am
- Location: Kuching, Sri Aman, Limbang, Lawas
Re: Sri Aman Division (Tracks/POIs)
Track update for Lubok Antu. - Kpg Kutai
Done 10/7/2011 -- tympg
Done 10/7/2011 -- tympg
You do not have the required permissions to view the files attached to this post.
Return to “East Malaysia & Brunei Map Feedback”
Who is online
Users browsing this forum: No registered users and 18 guests