Johor Bahru Tracks and POIs feedback (Part 2)
Moderators: Moderators, Regional Mappers
Forum rules
1. Be nice to each other and respect the moderators. Post in normal font size, color and weight. Follow Nettiquette
2. NO out of topic. This forum is strictly for feedback to our maps
3. NO posting of data copied from other source especially malsingmaps
4. NO abuse, profanity and insults
5. NO spamming, cross posting and opening of duplicate topics
6. NO post/link to warez, cracks, serials or illegally obtained copyrighted content
7. Each message posted is owned by and is the opinion of the original poster. Neither mfm nor its owner or moderators are legally responsible for anything posted on the forum
1. Be nice to each other and respect the moderators. Post in normal font size, color and weight. Follow Nettiquette
2. NO out of topic. This forum is strictly for feedback to our maps
3. NO posting of data copied from other source especially malsingmaps
4. NO abuse, profanity and insults
5. NO spamming, cross posting and opening of duplicate topics
6. NO post/link to warez, cracks, serials or illegally obtained copyrighted content
7. Each message posted is owned by and is the opinion of the original poster. Neither mfm nor its owner or moderators are legally responsible for anything posted on the forum
Re: Johor Bahru Tracks and POIs feedback (Part 2)
Noted. Thanks and Happy CNY!
Please submit your Tracklogs & POI here : http://malfreemaps.com/viewtopic.php?f=16&t=11636
Re: Johor Bahru Tracks and POIs feedback (Part 2)
No longer possible to Keep-Right to Tun Abd Razak Exit (forced to Keep-Left) if you are exiting from inner road as attached.
You do not have the required permissions to view the files attached to this post.
-
- Posts: 11
- Joined: Tue Feb 16, 2010 12:56 pm
Re: Johor Bahru Tracks and POIs feedback (Part 2)
Iskandar Regional Development Authority (IRDA) building 01.28.965N 103.43.115E
- fruitplus
- Polygon Mapper
- Posts: 1425
- Joined: Sat Jan 24, 2009 3:35 pm
- Location: On The Road
- Contact:
Re: Johor Bahru Tracks and POIs feedback (Part 2)
GoLaiSlow1 wrote:Iskandar Regional Development Authority (IRDA) building 01.28.965N 103.43.115E
Should be this format N1.48275 E103.71858
Easy for mapper put in the map.
Use MapSource would be nice...

Past + Present = Future
- fruitplus
- Polygon Mapper
- Posts: 1425
- Joined: Sat Jan 24, 2009 3:35 pm
- Location: On The Road
- Contact:
Re: Johor Bahru Tracks and POIs feedback (Part 2)
Road already finished construction & have dual carriage.
Later will try to update the track..if anybody use that road can help to track..
N1.46137 E103.74390 to N1.47470 E103.73667
Later will try to update the track..if anybody use that road can help to track..

N1.46137 E103.74390 to N1.47470 E103.73667
You do not have the required permissions to view the files attached to this post.
Past + Present = Future
Re: Johor Bahru Tracks and POIs feedback (Part 2)
Please change the POI (N1 29.069 E103 42.920) name from "Grand Straits Gdn" to "Grand Straits Garden Seafood Restaurant" to facilitate searching... Thanks.
Re: Johor Bahru Tracks and POIs feedback (Part 2)
New Petronas Kiosk..under construction..75% Completed
N1 28.162 E103 54.289
N1 28.162 E103 54.289
You do not have the required permissions to view the files attached to this post.
- williamreg
- Posts: 52
- Joined: Mon May 04, 2009 12:58 pm
- Location: Singapore
Re: Johor Bahru Tracks and POIs feedback (Part 2)
Papago seem always takes a long route to Shell (Tebrau2). Please change Shell (Tebrau2) coordinate to E103 45'53.1 N1 30'11.5 Thanks.
Holux GPSmile 53CLife -> Garmin 255W -> Papago Z880
Re: Johor Bahru Tracks and POIs feedback (Part 2)
I hope this is the right thread ... was discuss in MFM 100215 (main) thread
http://www.malfreemaps.com/viewtopic.php?p=98240#p98240
I just wonder why the routing does not calculated until the disconnected route
http://www.malfreemaps.com/viewtopic.php?p=98240#p98240
dvpro wrote:The problem lies with the destination as the nearby road is disconnected from the main road at N1.62578 E103.83076. However I'm not sure whether this is deliberate or otherwise. Do provide this feedback at the appropriate regional topic (Johor Map Feedback).
I just wonder why the routing does not calculated until the disconnected route
You do not have the required permissions to view the files attached to this post.
- dvpro
- Moderator
- Posts: 2169
- Joined: Sat Sep 20, 2008 6:09 am
- Location: KUL, MY (Handheld, PDA Based)
Re: Johor Bahru Tracks and POIs feedback (Part 2)
rasfan wrote:I just wonder why the routing does not calculated until the disconnected route
Just before the point of disconnect should be okay.
I take everything in moderation, including moderation.
Return to “Johor Map Feedback”
Who is online
Users browsing this forum: No registered users and 23 guests